          Thermal Power Planning, Investigation, Design and Consultation

          Updated: 2013-07-03

          POWERCHINA has 12 institutes specializing in planning, investigation and design for thermal power generation and power transmission and distribution projects and more than 6,000 technical staff. The institutes provide technical services covering thermal power project planning, investigation and design,project safety appraisal and acceptance, construction cost account and analysis, environmental impact assessment, environmental protection project design, labor safety and industrial hygiene appraisal, project consultation and review, construction supervision, software development, and project bidding agent service.

          The installed capacity designed by POWERCHINA amounts to 310,000 MW, or 37.85 percent of thermal power capacity in China. Moreover, we have carried out planning and research work in the following areas: regional power markets, power consumption, power supply and grid planning, energy planning, electricity transimission from western areas to East China, trans-regional network connection, and structural upgrading and optimization for power industry. We are also responsible for the standardization of the investigation, design and R&D of power sector, power technology innovation, introduction and localization of advanced technologies from overseas. We have done planning, investigation, design, and consultation of almost 100 power projects for dozens of countries.

          POWERCHINA leads the domestic market and has reached advanced level in the world in the fields of 1,000-MW ultra-supercritical coal-fired plants, thermal power plants with high or low technical parameters, and combination operation of air cooling units and nuclear power units, and in the areas of natural gas, shale gas, garbage power, solar energy, wind power, biomass energy, and geothermal energy technology and distributed energy sources.

          1) Thermal power generation

          POWERCHINA has conducted planning, investigation and design on thermal power units of 1,000-MW or lower for a large number of thermal plants with PC, CFB, and oil-fired boilers. The design of thermal power units with 1,000-MW capacity and 600-MW supercritical and ultra-supercritical high parameters has come out top. Over the past few years, we have completed a great number of consulting and design tasks, including 30 consulting and 4 design projects for 1000-MW thermal power plants, 75 consulting and 45 design projects for 600-MW thermal plants, and 138 consulting and 101 design projects for 300-MW thermal power plants.

          2) Ultra-supercritical coal-fired power generator units

          Thermal Power Planning, Investigation, Design and Consultation

          Pingdingshan Power Plant No.2 (2×1,000-MW) in Henan province, putting into operation in 2010, won the first places for excellent design of the electric power industry, the first prize for excellent design of construction industry, and a gold medal for national high-quality projects, 2011-2012.

          POWERCHINA has major technical advantage in design of ultra-supercritical units of 1,000 MW, 660 MW and 600 MW and designed China's first 660-MW ultra-supercritical re-heating unit.

          a) Air cooling units with large capacity and high performance

          Thermal Power Planning, Investigation, Design and Consultation

          The Huaneng Shang'an Power Plant III was put into operation in 2008, which is the first 600MW supercritical air cooling unit in the world and provides a new energy conservation technique for BED type ball mill and side bunker arrangement. It was awarded the first award for excellent design, the silver prize of national high-quality project and the award for power quality engineering.

          b) CFB design

          Thermal Power Planning, Investigation, Design and Consultation

          The Fenyi Power Plant, a national demonstration base of CFB, installed with China's first 100-MW CFB unit, (putting into operation in 2000), 210-MW unit (operation in 2006) and 330-MW unit (operation in 2008). It got the first prize for science and technology progress of electric power industry.

          POWERCHINA has a great ability to design CFB units, and it has achieved some CFB units with a capacity of 10 MW to 330 MW.

          Previous Page 1 2 Next Page

          主站蜘蛛池模板: 亚洲天堂一区二区成人在线 | 国产成人午夜精品永久免费| 成人国产乱对白在线观看| 国产地址二永久伊甸园| 国产午夜亚洲精品国产成人| 国偷精品无码久久久久蜜桃软件| 蜜臀精品视频一区二区三区| 秋霞电影网| 国产精品国产三级国av| 波多野结衣视频一区二区| 女人高潮被爽到呻吟在线观看| 69天堂人成无码免费视频| 精品熟女少妇免费久久| 农村妇女高清毛片一级| 亚洲国产成人久久综合区| AV无码免费不卡在线观看| 国语自产拍精品香蕉在线播放| 久久精品99久久久久久久久| 东方四虎av在线观看| 99国精品午夜福利视频不卡99| 国色天香成人一区二区| 亚洲国产成人片在线观看| 中文字幕一区二区三区麻豆| 国产精品亚洲综合色区丝瓜| 色爱av综合网国产精品| 国产一级r片内射免费视频| 国内精品久久久久电影院| 蜜桃视频在线免费观看一区二区| 国产精品国产三级国产试看| 国产麻豆精品av在线观看| 国产亚洲精品2021自在线| 亚洲AV无码AV在线影院| 4hu四虎永久在线观看| 中文字幕99国产精品| 日本xxxx丰满超清hd| 国产精品一区 在线播放| 中文字幕有码日韩精品| 蜜臀91精品国产高清在线| 熟女一区二区中文在线| 一级片黄色一区二区三区| 激情伊人五月天久久综合|