<tt id="6hsgl"><pre id="6hsgl"><pre id="6hsgl"></pre></pre></tt>
          <nav id="6hsgl"><th id="6hsgl"></th></nav>
          国产免费网站看v片元遮挡,一亚洲一区二区中文字幕,波多野结衣一区二区免费视频,天天色综网,久久综合给合久久狠狠狠,男人的天堂av一二三区,午夜福利看片在线观看,亚洲中文字幕在线无码一区二区
          OLYMPICS / center

          Facts and figures

          Xinhua
          Updated: 2008-08-08 21:50

           

          BEIJING -- The 29th summer Olympic Games opened in Beijing on Friday night. The following are some facts and figures about the opening ceremony.

          THE VENUE

          The opening was held in the National Stadium, also known as the Bird's Nest, in the Olympic Green in northern Beijing.

          The stadium was jointly designed by Herzog & de Meuron Design Office, and China Architecture Design & Research Group and ARUP. Its construction began on December 24, 2003, and completed on June 30, 2008. Altogether 45,000 tonnes of steel was used to build its framework.

          The stadium's seating capacity is 91,000, including 11,000 temporary seats. The floor space is 258,000 square meters.

          GROUND FACILITIES

          A major elevating platform at the center is 20 meters in diameter, weighing about 400 tonnes, and can reach 11.4 meters high at a speed of zero to 12 meters per minute.

          Two moving lids on the stage serve as a roof.

          A 36 by 22 meters LED screen is installed on the plates.

          On the south and north sides are 30 complementary platforms, with each 3-meter-wide and 3-meter-long.

          When the two lids move toward the center, the complementary platforms will rise and make up the stage.

          Two sets of 22-meter-long LED scroll painting were installed, with a diameter of 22 meters.

          With LED images shown on it, the scroll painting can stretch 147 meters long.

          ABOVE-STAGE FACILITIES

          Ten steel ropes are hung above the stage, weighing 40 tonnes in all and with a total length of 55 kilometers.

          Among the 31 wire devices, 16 sets can carry a load of 300 kilograms each, with a load of 100 kilograms for each of the other 15. All can move at 3 meters per second and can function at the same time.

          One hundred jumping facilities with a load capacity of 80 kilograms each are set under the rim of the roof edge, which can move at 3 meters per second and be operated simultaneously.

          LED SCREEN ON THE GROUND

          A 147 by 22 meters LED screen is laid at the center. Approximately 44,000 colorful LED beads are embedded with a distance of 600 millimeters between each two.

          FIREWORKS CELEBRATION

          -- 287 points on the top of National Stadium

          -- 27 positions in the central area of National Stadium

          -- 12 positions in the Olympic Green

          -- 29 positions on the axis of the city

          -- 4 places in other urban areas

          MUSIC

          A total of 110 minutes of music was created by 18 composers for the opening ceremony.

          LIGHTING

          Altogether 2,583 special lights are used and lighting equipment weighing more than 300 tonnes has been installed. Electricity load for lighting totals 6,440 kilowatt.

          COSTUMES

          A total of 15,153 sets of costumes in 47 styles.

          REHEARSAL

          Some performances have been rehearsed for 13 months. Volunteers began their first mass rehearsal in March 2008.

          Comments of the article(total ) Print This Article E-mail
          主站蜘蛛池模板: 精品日韩av在线播放| 久久这里只精品热免费99| 在线高清免费不卡全码| 精品黄色av一区二区三区| 中文字幕 日韩 人妻 无码| 久久精品国产亚洲精品2020| 国产乱码一区二区三区免费| 精品日韩人妻中文字幕| 亚洲精品色婷婷一区二区| 91密桃精品国产91久久| 四虎成人在线观看免费| 久久精品国产99久久6| 国产精品一区二区久久岳| 中文字幕在线观看一区二区| 唐人社视频呦一区二区| (原创)露脸自拍[62p]| 亚洲最大成人免费av| 性国产vⅰdeosfree高清| 九九热免费在线视频观看| 美女自卫慰黄网站| 国产亚洲精品97在线视频一| 亚洲成aⅴ人在线观看| 亚洲第一香蕉视频啪啪爽| 人妻出轨av中文字幕| 天天射—综合中文网| 国产精品美女久久久久久麻豆 | 国产永久免费高清在线| 日韩精品无码一区二区三区| 成人国产精品一区二区网站公司 | 波多野结衣久久一区二区| 国产精品午夜精品福利| caoporn成人免费公开| 日韩av在线高清观看| 精品精品亚洲高清a毛片| 国产午夜精品一二区理论影院| 一本久道久久综合久久鬼色| 水蜜桃视频在线观看免费18| 国产一区二区三区的视频| 美女胸18下看禁止免费视频| 精品人妻伦一二三区久久| 精品国产免费人成在线观看|