<tt id="6hsgl"><pre id="6hsgl"><pre id="6hsgl"></pre></pre></tt>
          <nav id="6hsgl"><th id="6hsgl"></th></nav>
          国产免费网站看v片元遮挡,一亚洲一区二区中文字幕,波多野结衣一区二区免费视频,天天色综网,久久综合给合久久狠狠狠,男人的天堂av一二三区,午夜福利看片在线观看,亚洲中文字幕在线无码一区二区

          Home> Events> Province Events> Hunan> Overview

          Energy

          2017-04-18

          Changsha

          The energy development in Changsha ranks among the top in China and the top most in Hunan province.

          Abundant supply of fossil energy

          In 2015, the sales volume of refined oil products reached 2.22 million tons. Last year, Changsha housed 230 refueling stations, myriads of natural gas pipelines (including 218 km-long sub high pressure ones and 1197 km–long medium pressure ones) with a supply of 846 million cubic meters, 3 stations for natural gas transmission and distribution, 1 station for natural gas storage and distribution and 18 high-medium pressure regulating stations.

          A more stable and sustainable supply of electricity

          During the 12th Five-Year Plan, we established 1,10,20,39 substations with the maximum voltage of 500 kV, 220 kV, 110 kV and 35 kV. Newly increased circuits with the maximum voltage of 110 kV, 35 kV, 10 kV approached 474 km, 90 km and 2765 km. Electricity has been accessible to the integral hub of Changsha avionics. Various power generation methods have been integrated with the total power generating capacity reaching 31.7 kW.

          Wider application of solar energy

          Much progress has been made in pilot projects utilizing renewable energy and setting up relevant facilities, as evident in the solar thermal collectors with a total coverage of 77500 square kilometers. Distributed photovoltaic power generation underwent wider application with the total capacity standing at 150 megawatt. Further efforts have been made in wind power generation and plants that are completed or under construction will be equipped with the power generating capacity of 320 MW.

          Better development of biogas

          The landfill (also known as rubbish dump) on Hemi Peak in Wangcheng district, with an installed capacity of 10.17 MW in terms of power generation, transmitted 2,794 cubic meters of methane to the citizens in 2015. Users of biogas hit 340,000 while the total output of biogas was 156 million cu m, indicating that the application of biogas has risen up to a higher level.

          Better use of shallow geothermal energy

          The projects that apply shallow geothermal energy with the ground source heat pump (hereinafter referred to as GSHP) as the major source covers an area of 1.93 million square meters. GSHP is extremely popular in areas featuring sound hydrological conditions. The installed capacity of projects utilizing distributed energy either completed or under construction, has reached 64 MW.

          Remarkable progress made in energy conservation in major fields

          Due to the rules and regulations on energy conservation in construction, the proportion of new and environmentally friendly materials for walls rose to 92.6 percent. There are 282 green building pilot projects, with a total demonstration area of 41.7 million square meters. A number of 188 newly increased pilot projects on renewable energy applied in buildings were completed, with a total covered area of 4.51 million square meters. Meanwhile, pilot projects with environmentally friendly materials stood at 188 and covered an area of 4.5 million sq km. Due to the strategy that prioritizes public transportation, buses driven by clean and new energy accounted for 84.7 percent. Moreover, more EV chargers will be set up in downtown and the neighboring towns. Public transportation that is environmentally friendly will continued to be highlighted on the agenda by advancing the driving simulators and green commuting.

           

          Zhangjiajie

          Zhangjiajie's energy development plans adhere to diversity, cleanness and low carbon strategies to strengthen the protection and balance of energy supply and demand, as well as actively optimizing energy structures and continuously improving energy efficiency.

          The coal field increases the elimination of backward production capacity to achieve industrial upgrading and encourage the implementation of "coal to gas" exchange.

          The electric field deepens hydropower potential. During the 13th Five-Year Plan period (2016-20) it intends to develop 11 small river power supply points, the Lishui River power supply point, 11 new hydropower stations and 3 small hydropower stations to achieve a total installed capacity of about 370 thousand kilowatts. It furthers optimization through the upgrading of power grid structure, perfecting main power grid of 220 kV and more, and promoting the transformation and upgrading of rural power grids, improving the level of access and developing transport capacity.

          In the field of oil and gas, the construction of natural gas pipeline network and shale gas development is being accelerated. Development of the urban natural gas pipeline network and ancillary facilities such as peak and reserves has been intensified to achieve full coverage of the city network planning area. As the northwestern Hunan area was included as a priority in the national exploration, development and utilization of shale gas development, subsequent prospective deployment of shale gas transmission and distribution pipe network construction has led to an increase in the pace of commercial exploiting shale gas.

          The new energy field focuses on complementary energy development and utilization. Vigorous development of wind and solar energy, focus on the development of distributed photo-voltaic power generation, and active promotion of the household photo-voltaic power generation system and public solar photo-voltaic lighting system are just some of the cooperative projects. Further development of biomass energy in line with the "culture - biogas - agriculture" ecological model and active promotion of biomass and biogas centralized gas supplies have resulted in the rational development of landfill biogas power generation projects. The steady development of geothermal energy continues, with deployment plans in the Lishui River to utilize the shallow waters and suitable temperature.

          New energy automotive applications vigorously promote the construction of electric vehicles. Our city's public transport charging sites and equipment construction project is the province's first to fight nationally for special bonds for the project, with funds estimated at just over 48 million yuan. According to the "Zhangjiajie city electric vehicle charging infrastructure" plan, we will establish 13 charging sites in Yongding city and 6 in Wulingyuan district. Charging pile installation equipment will consist of 295 sets in Yongding and 85 sets in Wulingyuan district, with a total investment of 345 million yuan.

           

          主站蜘蛛池模板: 中文字幕亚洲综合第一页| 中文字幕国产原创国产| 亚洲成人av一区免费看| 欧美高清狂热视频60一70| 国产在线视频导航| 午夜在线不卡| 国产一级二级三级毛片| 18禁国产一区二区三区| 国产精品成人观看视频国产奇米| 日韩av日韩av在线| 99精品日本二区留学生| 亚洲色成人一区二区三区| 人妻一区二区三区三区| 久久精品久久电影免费理论片| 十九岁的日本电影免费观看| 国产高清午夜人成在线观看,| 9999国产精品欧美久久久久久| 国产一区二区三区自拍视频 | 欧美激情内射喷水高潮| 日本精品网| 亚洲午夜成人精品电影在线观看| 人妻有码av中文字幕久久琪| 青青青草国产熟女大香蕉| 香蕉乱码成人久久天堂爱| 久久精品道一区二区三区| 激情综合网一区二区三区| 爆乳女仆高潮在线观看| 中文字幕在线精品人妻| 国产91色综合久久免费| 国精品午夜福利视频不卡| 无码专区视频精品老司机 | 国产极品精品自在线不卡| 在线综合亚洲欧洲综合网站| 99热久久只有这里是精品| 国产精品午夜精品福利| 伊人色合天天久久综合网| 国产午夜精品久久精品电影| 国产精品大全中文字幕| 大陆精大陆国产国语精品| 中文字幕日韩人妻一区| 麻豆一区二区三区精品视频|